Namibia: Neckartal Dam near Keetmanshoop

The Neckartal Dam is the largest dam in Namibia, covering a surface area of about 25 km2. The dam, located 40 kilometers northwest of Keetmanshoop, is a crucial resource for supporting future agri-tourism projects in the region.

The Neckartal Dam, nicknamed the Desert Dragon, is a dam located in the ǁKaras Region of southern Namibia. It is a curved gravity dam on the Fish River near Berseba, 40 kilometres north-west of the regional capital Keetmanshoop. Construction started in 2013 and was initially expected to finish in 2017. Since its completion in 2018, it is the largest dam in Namibia, more than three times the capacity of the Hardap Dam upstream. The dam's purpose is to support a 5,000 hectares irrigation scheme nearby.

Construction

The idea to construct a dam near Keetmanshoop already came up during the era of German colonialisation. Upon Namibian independence in 1990, the planning slowly came into motion. Although hailed as a promising job creation project, particularly after commission due to the purpose as an irrigation dam, there were doubts over the necessity to build it. Naute Dam in the same area, likewise an irrigation dam, is under-utilised. However, for an irrigation scheme of 5,000 hectares as envisaged for the Neckartal Dam, Naute Dam was deemed too small.

Italian company Salini Impregilo was awarded the 2.8 billion Namibian dollar tender to build the dam in March 2012. After a legal challenge by one competitor, the tender was withdrawn but re-awarded to the same company in August 2013. Construction started within a month. Originally planned to take 3 years, the project has been delayed by a court case and labour unrest. Its completion occurred in October 2018, after which the filling-up phase was expected to last another two years. The dam overflowed for the first time on 19 January 2021 after an exceptionally good rainy season.

Purchase photo/4K video: portfolio1 portfolio2
Aerial photo/video service/inquiries: info@traveltonamibia.com
Telegram: ExploringNamibia

Monday, 28 March 2022

Namibia: aerial video of Fish River meeting Orange River | Реки Фиш и Оранжевая Намибия

#NamibiaRainyChronicles #ExtremeWeatherSouthernAfrica #FishAndOrangeRivers #HelmeringhausenRiver #DieHelmeRiver

A rainy season aerial video reports by Mr. Björn Basler: flowing rivers in Helmeringhausen area: Die Helme River and Fish River flowing into Orange River in March 2022.

Floods in Windhoek and Namibia, January 2021:

https://youtu.be/CTKSLfBjFVU

Keetmanshoop:

http://www.namibweb.com/keetmanshoop.htm

Historical floods in Namibia with photos:

http://www.namibweb.com/floods-namibia.htm

According to the latest estimates 2021-2022 rainy season is one of the best in Namibia's recorded history although some parts of the country experienced damaged, blocked and closed roads, flooded houses, burst dams and washed away walls. Flash flooding has been reported as well as severe flooding in southern regions of Namibia. NamWater reported that most dams in Namibia are close to 100% full.

YouTube video:


Björn Basler:

https://www.facebook.com/bjorn.basler.7

1. "Meeting-point" (GPS: -28.093096, 17.1740684): The Fish River meeting the Orange River on 15 March 2022. Fish River still feeding the Orange River with substantial amount of water.

2. Helmeringhausen Glamping Adventure Camp
Karas Region

COOPERATION:

1. Send your video to namhren@gmail.com
2. Watch it on our compilation
3. Get links and views to your channel

YouTube channel Exploring Namibia TV publishes four video a week: on Tuesdays, Thursdays, Saturdays and Sundays. Themes range from travelling in Africa to exploring Europe and Russia. No annoying endless begging "hit/smash that bell" and "don't forget to sub" here.

© Exploring Namibia TV

Facebook:

NAMIBIA:
https://www.facebook.com/groups/namibia.namibia

✩F A C E B O O K | ФБ ►https://www.facebook.com/ExploringNamibiaTV
✩INSTAGRAM | ИНСТА ►https://www.instagram.com/exploringnamibia
✩V K EN TV | ГРУППА ВК ►https://bit.ly/2I3ws4P
✩T W I T T E R | ТВИТТЕР ►http://twitter.com/TravelToNamibia
✩PURCHASE VIDEO P5 | ПОРТФОЛИО P5 ►https://bit.ly/2Vvbb6L
✩W E B S I T E | САЙТ ►http://www.traveltonamibia.com
✩C O N T A C T | КОНТАКТЫ ►info@traveltonamibia.com
✩W H A T S U P T E X T | ВОТСАП ТЕКСТ: +264 816 654893

www.traveltonamibia.com
YouTube: Exploring Namibia TV
Purchase photo/4K video: portfolio1 portfolio2
Aerial photo/video service/inquiries: info@traveltonamibia.com
Telegram: ExploringNamibia

Friday, 13 November 2020

Namibia: Neckertal Dam & Theodor Rehbock

Neckertal Dam & Theodor Rehbock

If one were to build a solid concrete wall one meter high and one meter wide from Cape Town past Keetmanshoop in the south of Namibia, one would need the same amount of concrete that was used to build the recently-inaugurated Neckertal Dam west of Keetmanshoop.

To construct the dam wall which is 540 meters long at the crest and 60 m wide at the bottom, more than a million cubic meters of concrete were used. The dam wall is 82,5 m high from the lowest point to the non-overspill crest and can store a total of 857 million cubic meters of water when full. This is three times the amount that can be stored in the Hardap Dam near Mariental. Neckartal dam stretches 38 km upstream with a surface area of 25 km². It is a curved gravity dam in the Fish River, 40 km west of Keetmanshoop, and a few kilometers north of Seeheim.

The dam will mainly be used for irrigation purposes and the government plans to have 5000 ha made available for the farming of Lucerne, dates, grapes, and vegetables. Water will be released at a rate of 50 m³ per second by two turbines which are three meters in diameter and which can together generate 3,5 MW per hour.

The water will flow down the Fish River for 13 km where it will be dammed up at an abstraction weir from where the water is being pumped into a reservoir on top of a hill, nine km away. From there the irrigation scheme will be supplied with water. All necessary infrastructure is already in place.

On the 13th March this year (2020), the Neckartal dam was officially inaugurated by Namibia’s Vice President Nangolo Mbumba. Construction had started on the 11th September 2013 and was completed in September 2019. The plans to build a dam on this site in the mighty Fish River date back to German colonial times.

In 1896 and 1897 Theodor Rehbock, who was born in Amsterdam in 1864, at the invitation of the colonial Syndicate of Water Affairs, conducted an expedition through Namibia and South Africa. During this, he became a visionary of a country transformed by more permanent water supplies in farm dams and massive dams in river beds.

He designed Pokkiesdraai and Avispoort Dams for Windhoek, Hatsamas near Dordabis, De Naauwte or Naute Dam in the Löwen River southwest of Keetmanshoop in the now !Karas region and a system of terraced dams in the Fish River starting with the Kommatsas North dam (today´s Hardap Dam) and climaxing with Kokerboomnaute or Neckertal Dam. In his two books, German South West Africa, its economic development with special emphasis on the usage of water resources (Berlin 1898) and Germany´s duties in German South West Africa (1904), he outlined his designs and his plans to finance the projects.

Farm dams were the responsibility of the individual farmers organized in co-operatives and aided by state-sponsored credit institutes. Larger dams would be state-financed and could be linked to farming co-operative complexes.

The project derived its name from Neckartal and Kokerboomfontein; two farms just outside Keetmanshoop and the Berseba Reserve. Theodor Rehbock attended school in the Netherlands and Germany and studied engineering at the Technological Institutes in Berlin and Munich. After completing his diploma, he was engaged in prestigious projects: building the innovative arch bridge across the River Weser in Germany and renovating the German Parliament (Reichstag).

In 1899 Rehbock became a professor of hydrology in Karlsruhe. In the 35 years he spent there, he became famous for the mock-ups he constructed which were up to 60 m in length and in which he tested the behavior of water before putting his plans into practice. His academic obligations did not prevent national and international engagements in Spain, South America (Panama Canal), and New Zealand. His most prestigious work was making the Rhine navigable up to Switzerland, solving problems that had arisen during the construction of the gigantic Dutch Zuiderzee polder system. He remained eager to put his Namibian dam projects into practice.

Though his ideas became significant during the German colonial period, the war lasting from 1903 to 1908 disrupted further plans. This was also due to the enormous amounts of money spent during the war. Farm dams were constructed, but plans for the larger dams were only approved in 1912 and then aborted by the time World War I started.

From 1915 to 1955 not much happened in terms of building further dams, and Theodor Rehbock and his ideas were somewhat forgotten, despite the fact that he was considered an international engineering celebrity. The poor whites flooding into Namibia from the south, received Land Bank credits to drill boreholes on their farms. In 1933, at the height of drought and global depression, dams were built hastily at Avis and in Ovamboland as part of a relief-payment-for-work-scheme.

After World War II and between 1955 and 1969, water affairs officials Otto Wipplinger and Heinz Stengel built many of today’s dams in Namibia. Thereby they reactivated many Rehbock traditions and visions. Upon their retirement and resignation, water affairs lapsed into relative inaction.

The second phase of the Neckartal project now awaits completion, in order to use the dam’s potential to the fullest and to benefit the people in the surrounding area. Not only will agriculture provide jobs and food security, but even tourism can play an important role in job creation efforts. Water sport like water skiing and angling on Namibia's biggest dam could attract many tourists for competitions and leisure, an aspect Rehbock had never considered. With all the water available, the natural world too will benefit and another paradise for aquatic birds could establish itself in this part of the country.

Honours:

Rehbock weir – a device to accurately measure the discharge in open-channel flows.

Rehbock dentated sill – for kinetic energy dissipation at the end of a stilling basin, into which the spillway of a large dam ends. This, in order to prevent or reduce scour.

Theodor Rehbock Medal – of the Deutsche Vereinigung für Wasserwirtschaft, Abwasser und Abfall (DWA; German Association for Water, Wastewater and Waste), to honour members who made outstanding innovations within the fields covered by the association. This award has been established in 2007.

Honorary doctorates from the Technical University Munich and the Palatine Joseph University of Technology and Economics in Budapest.

Honorary Member of the Dutch Royal Institution of Engineers (KIvI) in The Hague.

A street in Karlsruhe has been named after him.